Revit - Revit MEDIT Measurements on ®

A great revitiano English, shared with me, this new Revit application. He asked me to extend to all who read this blog, and here goes ...

Thanks Alberto!, And always remember us and keep up with these developments

MEDIT: Measurements on Revit ®

Pantalla principal de la aplicación.

Medit is an extension of Autodesk Revit ® improving the information and contents of the model by linking Revit family types and predefined elements of financial databases developed construction prices FIEBDC formats.
Medit functionalities are operating within their own work session of Revit ® and features a streamlined user interface to make these links. This allows designers to incorporate the Revit model, interactively, the standard definition of items and their cost, while developing the project.
To
Medit assignments works equally well with the types or existing materials in the Revit model:
• Types hierarchically organized by categories and Families Revit with information on your level and item ID.
• Materials are organized hierarchically based on the Types in which they operate.
With Medit user dynamically organizes the budget Chapters by those who moved Revit Model Types. In this way the budget is automatically updated by the measurement lines of the new elements and new types that are incorporated into the Revit model.
The budget is thus a cost model linked to the Revit model that provides valuable information from the initial phases of the project to completion.

This is especially effective when combined with the partition Medit Revit Model into subprojects, making teamwork is highly productive.
DATABASES PRICES OF CONSTRUCTION
Medit Bases can load as many formats Price FIEBDC-3 as desired, in a quick and easy.

If you wish, you can also make a short list of budget items and upload Medit. So you can have 80 0 90% of the games predictable and add missing from other price bases.

bases loaded in Medit prices can be edited by modifying the wording of its definition and stored for use in other budgets.

The selected items can also be edited once incorporated into the budget for specific use for once.
EXPORT AND OTHER FEATURES

Medit exports all related information between Revit Model and Cost Model to other formats:

FIEBDC-3 : The budget is important to all business applications and Budget Measures (Memphis, Presto, etc) to continue his work editing Justification for price and aids that have not been reflected in the Revit model.
EXCEL : Cost Model can be exported to Excel at any time, generating a 3-Book Excel Budget Sheets Complete (Full descriptions of measurement lines), the Budget Summary (Summary Departure no measurement lines) and the Summary of Chapters. All Excel worksheets have calculated fields, so the user can change the weight or measurement or adding items, getting the total budget to date.
KEY NOTES : Medit generates a Keynote file with the same file name Revit so that the user can write using Keynotes or material elements of the model with the same number and name that budget items.
FACTOR : Medit allows the user to apply a factor the measurements, so measurements of length, area or volume are easily converted to weight or unit amounts of material. For example, the surface facing brick m2 multiplied by a factor of 36 ladrillos/m2 results of measuring the number of units facing bricks to be used in the work

Thursday, June 17, 2010

What Tie Matches A Grey Shirt

III

Shared Projects Editing

By using a shared project, you can edit individual elements or sub-projects. When removing these, the elements are visible to other users but can not edit until the borrower assigns the element or subproject.
When requesting a loan of an item that does not belong to any other user, you automatically grant the permission to edit the item.
If you need to modify an item that belongs to another team member, can apply for the loan of the item only.

Loan items

If the element belongs to another user must apply for the loan. When the application is approved, you can edit element. If you get a change to the item, you are prompted to load the latest changes from the central file before proceeding to edit the item.
By borrowing an item from a sub, its name appears in column Borrowers Subprojects dialog box. His name also appears in the Properties dialog box copy of the parameter.


To borrow an item

· Select an item not editable. An icon that says Make Element Editable / Make edits, when you stand on it.


· Click on the icon, this will be available if another user is editing. If another user is editing it, or another team member owns the subproject to which it belongs, a message indicating that you can not edit it until the other user depresses.





· Click Place Request / Submit Application. Seeking approval of its request to the user.
The owner will not receive automatic notification of the request, should contact the

Grant loan application element

· Select the Collaborate tab / Work à Panel Synchronize / Sync à Request Editing / Editing Applications




· ; The Prompt dialog box, expand it to see the item. Select it, and can with the button Show / Display, see item in a different view if it is not displayed in the active.
· Click Grant / Grant or, but want the other users to borrow the item, click Deny / Retract - Deny / Withdraw.
If the notice is an asterisk, you have not saved changes in the central file, which should make before granting an item.

Sub-project openings


open a sub-project, you can select the sub-project to open.

· Sign in to your local file copy, and select
· Expand the list of the option Open / Open
a. All / All: Open all sub-projects in the central file
b. Editable / Editable: Open all sub-projects editable. Can significantly reduce the performance gdes project files.
c. Last Viewed / Last Shown: Open sub-projects depending on the state of the previous Revit session, if it is the first time, open all files .
d. Specify…/ Especificar: Abre sub- proyectos, previamente especificados.

Aperturas de Sub-proyectos desde la ventana de Worksets

·          Abra su copia local
·          Worksets Active Window / Sub-projects
· Select the sub-project to open, and select the Open button
· Accept

Openings project files regardless of file sharing central

This procedure is used to open a file independently for users wishing to view or make changes without save, or project managers that, while not working on the file you wish to open the file for examination without disrupting the team's work
· Select the Utility menu à Open / Open à Project /
· Access to the central file, and select




· Click Open / Open
If you open a file with this option, the file opens normally. It contains information and route permit. You can modify all elements of the file, but no change can be stored in central file.

Ceder elements without synchronizing with the central file

to give elements for which he had permission to edit the file without synchronizing with central



·          Con el archivo local abierto à Solapa Collaborate/ Colaborar à Panel Synchronize/ Sincronizar à Relinquish all mine/ Ceder todo lo mío
Revit , comprueba whether any changes need to synchronize with the central file.

Working offline in another location

is possible to work remotely, if users have access to the central file through a network of high speed or either your local files can be transferred to a person who has access to the network.

to work offline or in another location :

· Mientras esté en la oficina, con una conexión a la red, haga editables los subproyectos pertinentes.
·          Asegúrese de guardar el archivo local antes de cerrarlo; de lo contrario, los cambios efectuados en las condiciones de edición del subproyecto no se guardarán en el archivo local al desconectarse.
· The method of work on the project outside the office is equal to that used in the office. You can modify editable sub-items, you can create new items in any sub.

Edition other items when working outside the office

To amend a sub-project that is not yours, you can do sub-project status Editable. This is known as Editable risk and should be avoided whenever possible.
· If another team member synchronize any changes made to the same elements that you have changed, you can not synchronize any changes you made to the central file. You will lose all changes you have made all subprojects.
· If working in a sub Editable at risk, follow these recommendations:
· Ask one of your coworkers who are in the office and access to central file log Revit Structure as if you and enter your name and username.
· Also ask to open the central file, remove all subprojects that you have as editable at risk, close the file and replace username with yours. There is no need to synchronize with the central file.
· This procedure prevents other users from making the sub-editable and change the same elements. If someone else has drawn a subproject or has borrowed elements of it, there is no guarantee that there will be no conflict cough.

Saturday, June 12, 2010

Wowp Pink Wallpaper Store

Teamwork Teamwork Teamwork II

Add items to the Sub-Project

  • Select the Collaborate tab / Work à Worksets Panel / Sub-Projects and select the sub-project from the dropdown list.
  • To appear in gray, all the elements that were not created in the sub active, select the Inactive Gray Worksets / Show inactive gray sub-projects, the flap Worksets / Sub-Projects.



  • Add the necessary items.



Reallocation of one element to another Sub-Project

  • Select an item and go to properties.
  • Locate the parameter WorkSet / sub-project in Identity Data / Identity Data, and select a sub-project name

Change the value of the parameter Editable

can only change the editable status of sub-projects that do not belong to other users
  • ; Select the Collaborate tab / Work à Worksets Panel / Sub-Projects à Worksets / Sub- projects.
  • Click the editable parameter, corresponding to the sub-project name and select Yes or No.

If you change the editable status before synchronizing with the central file, Revit will tell you which is the borrower of the elements that has changed in the sub-project.

Suppression Sub-Projects

  • Select the Collaborate tab / Work à Worksets Panel / Sub-Projects à Worksets / Sub-projects.
  • Select the sub-project you want to delete, then click the Delete / Remove.

This option is not active, if other users are editing the sub-project.


elimination in the window, indicate whether you want to delete the items in the sub-project or move other sub-project.
can not delete the Workset1, Share Level and Grids, Families, and delete views.

Save Project Sharing files

When you save changes to the local work-sharing, you can choose between two options:
  • Sync central file: Saves changes to it have been made in the local file, and copied to the local file, the changes made by other users within the central computer file since the last synchronization. It would give the items have been borrowed.
  • Save Locally : Proceed in the same way you would with a project file that is not shared.

central file synchronization

  • Select the Collaborate tab / Collaborate à Panel Synchronize / Sync à Synchronize drop-down menu with Central / Sync central à Synchronize Now / Synchronize Now.



For modify configuration parameters, select the dropdown menu, Synchronize and Modify Settings / Sync & Modify Settings.


  • Check the location of the central
  • Compact central file to reduce file size when saving, this increases the time saved.
  • In after syncing (After Synchronizing), may dispose of the items to other users, and maintain subprojects and editable items.
  • can also place a comment will be stored in central file and the tool shows history, you can view all comments.
  • Check Local Save File is selected and afer Before synchronizing with central / local Save file before and after you synchronize with the central file.

Close file without saving project sharing

SI local file is closed without saving, the following dialog box



  • Synchronize with central / Central File Sync: Save your changes to the central archive, including the local file saved. And the changes are copied from the other team.
  • Save Locally / Save Locally: Keep only in the local file and displays the next window.